10.5281/zenodo.1088517
Eric Costa
Sara Bragança
Rui Sousa
Anabela Alves
Benefits From A Smed Application In A Punching Machine
Zenodo
2013
Lean production
setup process
SMED.
2013-09-05
en
Journal article
https://zenodo.org/record/1088518
10.5281/zenodo.1088518
17166
Creative Commons Attribution 4.0
Open Access
<p>This paper presents an application of the Single-Minute Exchange of Die (SMED) methodology to a turret punching machine in an elevators company, in Portugal. The work was developed during five months, in the ambit of a master thesis in Industrial Engineering and Management. The Lean Production tool SMED was applied to reduce setup times in order to improve the production flexibility of the machine. The main results obtained were a reduction of 64% in setup time (from 15.1 to 5.4min), 50% in work-in-process amount (from 12.8 to 6.4 days) and 99% in the distance traveled by the operator during the internal period (from 136.7 to 1.7m). These improvements correspond to gains of about €7,315.38 per year.</p>
{"references": ["R. I. McIntosh, S. J. Culley, A. R. Mileham, and G. W. Owen, \"A\ncritical evaluation of Shingo's 'SMED' (Single Minute Exchange of Die)\nmethodology,\" International Journal of Production Research, vol. 38,\npp. 2377-2395, Jul 20 2000.", "S. Shingo, A revolution in manufacturing: the SMED system:\nProductivity Press, 1985.", "J. P. Womack, D. T. Jones, and D. Roos, \"The Machine That Changed\nthe World: The Story of Lean Production: How Japan's Secret Weapon\nin the Global Auto Wars Will Revolutionize Western Industry,\" New\nYork, NY: Rawson Associates, 1990.", "T. Ohno, Toyota production system: beyond large-scale production:\nProductivity press, 1988.", "S. Shingo, A study of the Toyota production system: From an Industrial\nEngineering Viewpoint: Productivity Press, 1989.", "R. I. McIntosh, S. J. Culley, A. R. Mileham, and G. W. Owen,\n\"Changeover improvement: A maintenance perspective,\" International\nJournal of Production Economics, vol. 73, pp. 153-163, Sep 21 2001.", "D. Van Goubergen and H. Van Landeghem, \"Reducing Set-up Times of\nManufacturing Lines,\" 2002.", "R. M. Sousa, R. M. Lima, J. D. Carvalho, and A. C. Alves, \"An\nindustrial application of resource constrained scheduling for quick\nchangeover,\" in Industrial Engineering and Engineering Management,\n2009. IEEM 2009. IEEE International Conference on, 2009, pp. 189-\n193.", "E. J. Hay, \"Any machine set-up time can be reduced by 75%,\"\nIndustrial Engineering, vol. 19, pp. 62-67, 1987.\n[10] R. T. Pannesi, \"Lead time competitiveness in make-to-order\nmanufacturing firm,\" International Journal of Production Research,\nvol. 3, pp. 150-163, 1995.\n[11] B. Ulutas, \"An application of SMED Methodology,\" World Academy of\nScience, Engineering and Technology, vol. 79, p. 101, 2011.\n[12] M. Gilmore and D. J. Smith, \"Set-up reduction in pharmaceutical\nmanufacturing: An action research study,\" International Journal of\nOperations & Production Management, vol. 16, pp. 4-&, 1996 1996.\n[13] S. C. Trovinger and R. E. Bohn, \"Setup time reduction for electronics\nassembly: Combining simple (SMED) and IT-based methods,\"\nProduction and Operations Management, vol. 14, pp. 205-217, Sum\n2005.\n[14] S. Tharisheneprem, \"Achieving full fungibility and Quick Changeover\nby turning knobs in tape and Reel machine by applying SMED theory,\"\nin Electronic Manufacturing Technology Symposium (IEMT), 2008\n33rd IEEE/CPMT International, 2008, pp. 1-5.\n[15] S. Patel, P. Shaw, and B. G. Dale, \"Set-up time reduction and mistake\nproofing methods\u2013A study of application in a small company,\" Business\nProcess Management Journal, vol. 7, pp. 65-75, 2001.\n[16] C. Moxham and R. Greatbanks, \"Prerequisites for the implementation of\nthe SMED methodology: A study in a textile processing environment,\"\nInternational Journal of Quality & Reliability Management, vol. 18, pp.\n404-414, 2001.\n[17] M. Perinic, M. Ikonic, and S. Maricic, \"Die casting process assessment\nusing single minute exchange of dies (smed) method,\" Metalurgija, vol.\n48, pp. 199-202, Jul-Sep 2009.\n[18] B. J. Singh and D. Khanduja, \"SMED: for quick changeovers in foundry\nSMEs,\" International Journal of Productivity and Performance\nManagement, vol. 59, pp. 98-116, 2009.\n[19] R. Fritsche, \"Reducing set-up times for improved flexibility in high-mix\nlow-volume electric drives production,\" in Electric Drives Production\nConference (EDPC), 2011 1st International, 2011, pp. 74-77."]}