10.20371/INAF/TECHREP/3
RUSTICELLI, SIMONE
SCHIAFFINO, MARCO
PERINI, FEDERICO
MONARI, JADER
AAVS1 Hybrid Cable's assembly and testing procedure
IRA Bologna
2019
INAF
INAF
2019-12-19
2019-12-19
2019
eng
Technical report
http://hdl.handle.net/20.500.12386/20461
3
This document describes the procedure whereby the 440 AAVS1 (Aperture Array Verification System) FEM were reworked by Lightech s.r.l. to be compatible with the pyramid assembly created by UCAM. Then there is a description of the reworking verification and the final testing procedure of the HC (Hybrid Cables).